Why do people have to go through an entire architectural drawing and engineering process for every single building we create? If a building plan is approved by government officials, that plan should be available on the approved list for anybody to use at any time going forward. It is stupid that people have to spend $20,000 or $30,000 every time they want to build a box that has been approved and built literally hundreds of thousands of times before.
The architectural and engineering special interests have really captured their regulators on this one.